RECEPTION
Each block has a dedicated double height reception.
- Walls: Plasterboard and painted, stone tile walls and glazed partitions.
- Floor: Stone tiles.
- Ceiling: Plasterboard and painted.
- Doors Revolving entrance doors.
- Lighting: Downlighters and recessed lighting.
- Furniture and fittings: Reception desk with security monitors and building management system terminal.
MAIN LIFT LOBBIES
- Walls: Stone tile to walls on ground floor, plasterboard and paint at basement and upper floors.
- Floor: Stone tiles.
- Ceiling: Plasterboard and painted.
- Lighting: Downlighters and recessed lighting.
- Lift Doors and reveals: Stainless steel door sets and architraves.
TOILETS
Sanitary facilities provided based on an occupancy ratio of 1 person : 10 Sq. M. net floor area (assuming 60% each gender).
At each floor in each block the sanitary accommodation includes one wheelchair accessible toilet and a Cleaners Store.
- Walls: Plasterboard and painted.
- Floor: Ceramic tiles.
- Ceiling: Plasterboard and painted.
- Entrance doors: Hardwood veneered with solid hardwood frame.
- Toilet Doors and partitions: Selected proprietary cubicle system.
- Lighting: Downlighters and recessed lighting.
- Vanity tops: Stone countertop.
- Sundry fittings: Sensor stainless steel tap, mirrors, paper towel dispensers.
Sanitary facilities for disabled occupants provided as outlined in TGD part M. Generally finishes are as those in the main toilets.
SHOWER & CHANGING FACILITIES
Each block has generous separate shower, toilet, changing, locker and drying room facilities at basement level. Wheelchair accessible sanitary accommodation and showers are provided.
Thirty two showers and six toilets allocated between block 1 and 2.
- Walls: Plasterboard and painted.
- Floor: Ceramic tile.
- Ceiling: Plasterboard and painted.
- Entrance Door: Hardwood veneered with solid hardwood frame.
- Toilet Doors and partitions: Selected proprietary cubicle system.
- High quality lockers and benches.
CATEGORY “A” FIT OUT
- Floors: raised access floors.
- Internal Walls: Plaster and painted.
- Ceilings: Perforated metal ceiling tiles.
- Air Conditioning: 4 pipe fan coil units.
- Lighting: LED luminaires with daylight control sensors.
- Tea Station: at each floor capped plumbing points for future tea stations (by others).
STRUCTURAL DESIGN SUMMARY
Superstructure typically comprises reinforced concrete flat slab construction with new floor plates comprising steel framed construction with composite metal decking.
Office Floor plate design imposed loading: 4.0kN/M2 (Occupancy) + 1kN/M2 (stud partitions).
Ceiling & Services = 0.5kN/M2, Raised Access Floor = 0.75kN/M2.
Flat Roof Design Imposed Loading = 1.5kN/M2.
Basement designed in accordance with BS8102.